The project was essentially to repair and rectify the shell and core of a 19th Century townhouse. The scope of works included the repairs to the roof structure, construction of a new roof, re-supporting floor joists, installation and fitting out of a third floor comprising two bedrooms and a bathroom, and external restoration works including easing and adjusting all the sash windows, brick re-pointing and painting external render.


Location:       Camberwell, South East London


Value:            £130k


Completion:   April 2017

Kingston Plaza Student Accommodation


The development consists of the construction of two new buildings on land at Lurke Street and St Cuthbert's Street, Bedford, entailing one 5 storey building being constructed (The Residence) and one 3 storey building being constructed (Social Housing), totalling 49 residential apartments with associated cycle parking, disabled parking and landscaping.


Location:      Lurke Street & St Cuthbert's Street, Bedford


Value:           £3.65 million


Completion:   Ongoing - Expected June 2018



Refurbishment of existing 1960's office developement into new 78 aparments under Permitted Developement rules over 5 floors. Removal of existing cladding and replacement with new updated curtain walling incuding adjacent existing tenant Travelodge.


Location:       Surbiton


Value:            £4.3 million


Completion:   November 2016

The Residence

Royal Exchange - The Old Post Office

21 London Lane

Building Contractor and Construction Management company

Tolworth Tower - North Wing

220 Camberwell New Road

Fareham Station


During the initial stages of a major development in the centre of Kingston Upon Thames, Trudgeon Roberts assisted with the temporary accommodation arrangements. We carried out works to the old Post Office which included repairs, temporary fire protection and fit out works.


Location:       Kingston Upon Thames


Value:            £45k


Completion:   October 2016


Trudgeon Roberts completed all the building elements as part of the Fareham Station Improvement Works. Refurbishment works included the demolition and strip out of existing platform facilities, and the installation of a new waiting room, female toilet, male toilet, disabled toilet and cleaners store.


Location:       Southampton


Value:            £150k


Completion:   February 2017


5 storey, 130 bed student accommodation with associated common areas & landscaping. Structure by Fusion Building Systems, rainscreen cladding consisting of zinc & stone, brickwork & curtain walling.


Location:      Kingston Upon Thames


Value:           £6.5 million


Completed:   September 2015



The project comprising the configuration of an existing live work unit, erection of a two storey rear extension at ground and first floor levels, erection of a two storey roof extension at second and third floor levels, including a roof terrace at second and third floor levels, to form 3 residential units.


Location:       Hackney


Value:            £790k